Facilities PDF Print E-mail

Since the current building that RND occupies was constructed in 1977, two further expansions have been undertaken to add to the physical building.  As a result, Regiopolis-Notre Dame is well equipped with equipment and facilities for all students and staff to use and enjoy.

 

Some of these facilities include:

  • The Pluard Library (constructed 1992)

  • The Jesuits of Upper Canada Gymnasium (constructed 1977)

  • The Congregation of Notre Dame Gymnasium (constructed 2004)

  • The Upper Room / Chapel (constructed 1992)

  • The Drama Room (converted 1992)

  • The Br. O'Gara Field (constructed 1977)

  • Cosmetology Lab (constructed 1992)

  • Wood Shop (constructed 1992)